To main page
Write us letter
Site map Переключиться на русский

 COMPLECT ECOLOGY

Is the parent enterprise of the Group of companies which exercises control over projects in Russian Federation and CIS. The Group of Companies includes research-and-development and analytical Center, laboratory, several branch establishments: "Ecology-Vodstroy" (Moscow, Russia), "KOMEKOPROM"
(Tver region, Russia) and representation in the Ukraine - "Complect Ecology - Ukraine"
(Dnepropetrovsk city).
PLANTS FOR OIL-CONTAMINATED STORM WASTEWATER

Main users:

  • Territories of enterprises.
  • Petrol stations.
  • Parking lots.
  • Depositories of oil products.
  • Stations of technical servicing.
  • Garages.

The Plants can be also used as water recycling systems for car-washes:

  • high treatment efficiency;
  • minimum installation expenses;
  • simplicity and safety in maintenance;
  • possibility for expansion;
  • compactness;
  • no need for constant servicing.
Treatment efficiency
Suspended solids S.S. (mg/l) 3
Oil products O.P. (mg/l) 0,05

Technical data
Area of plant, m2 4-35
The use of electric power, Wt -
Service Periodical

The plant is a monoblock consisted of tanks with heated lids. Lamella separation allows to part effectively oil products and suspended solids. Oil products from water surface are sorbed by special booms. Enhanced treatment occurs in a two-stage filter filled with special absorbent.

It can be produced in both aboveground and buried modifications.

Following components are necessary for the Plant installation: foundation plate and anchoring as well as connection of inlet and outlet pipelines.

Installation schemes

  • Plants in aboveground modification
  • SS - < 500 mg/l OP - 40 mg/l
    SS - 3 mg/l OP - 0,05 mg/l


    1. Grit chamber
        1.1 oil-absorbing boom
    2. Pumping station
        2.1 pump
        2.2 set of pipe-lines
    3. Plant
        3.1 thin film module
        3.2 filter media
        3.3 oil-absorbing boom

  • Plants in buried modification
  • SS - < 500 mg/l OP - 40 mg/l
    SS - 3 mg/l OP - 0,05 mg/l


    1. Grit chamber
        1.1 oil-absorbing boom
    2. Pumping station
        2.1 pump
        2.2 set of pipe-lines
    3. Plant
        3.1 thin film module
        3.2 filter media
        3.3 oil-absorbing boom

    Servicing

    1. Sediment utilization.
    Composition of accumulated sediment corresponds to sediment in primary sedimentation tanks of municipal wastewater treatment plants. Periodically the sediment is transported to processing.

    2. Replacement of filter media.
    Replacement and utilization of filter media is executed 2 times per year by COMPLECT ECOLOGY group of companies according to separate agreement.

    3. Replacement of sorbent.
    Replacement and utilization of sorbent is executed by COMPLECT ECOLOGY group of companies according to separate agreement. Replacement of sorbent for the Ist stage filters is fulfilled approximately one time per year, for IInd stage filters - one time per two years.

    4. Utilization of oil products.
    Oil products floating on water surface are absorbed by special booms. The booms are replaced approximately one time per year. Used booms are transported to boiler-houses for burning.

     

    Rambler's Top100


    tel: (495) 720-66-86, 441-63-39, 441-63-48, 441-63-61, 441-63-62, 441-63-72
    fax: (495) 721-16-53
    e-mail: sales@complecteco.ru


    Copyright by "Complect Ecology", 2003"
    Created Lernet Advanced Technology
    Optimisation and web promotion - company Web-Lider | Links